Search results
Case As an operator sometimes you already need to start deploying a new CPE (typically starting with a field trial), while the device hasn't gone yet through certification or HW acceptance testing. In such case running at least a 'do-not-harm' test campaign on the first units is crucial to make...
stabtest_1500px.jpg The case for DOCSIS 3.1 system validation Quality assurance testing provides an insurance against the damages from malfunctioning systems. In insurance it’s all about cost vs. risk, where risk is the probability of the issue times its impact. Over the years, Excentis has spotted...
Example case An operator was already deploying DOCSIS 3.1 equipment (both CCAP and CM) in its network, but only with OFDM enabled in the downstream. The operator wanted to enable OFDMA in the upstream, so both the CCAP and the Cable Modems had to be tested in order to validate the correct behavior...